IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12

matching recommendations
Reset
SIC 2076 Vegetable Oil Mills, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0508 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,154 $0 Implemented
SF0508 # 02 Y:2017 02 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $20,198 $2,023 Implemented
SF0508 # 03 Y:2017 03 2017 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $640 $553 Not Implemented
SF0508 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,172 $20,431 Not Implemented
SF0508 # 05 Y:2017 05 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,954 $26,825 Implemented
SF0508 # 06 Y:2017 06 2017 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,181 $6,155 Not Implemented
SF0501 # 01 Y:2017 01 2017 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,520 $0 Implemented
SF0501 # 02 Y:2017 02 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,047 $0 Not Implemented
SF0501 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $777 $84 Not Implemented
SF0501 # 04 Y:2017 04 2017 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $7,074 $1,769 Implemented
SF0501 # 05 Y:2017 05 2017 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,356 $1,821 Not Implemented
SF0501 # 06 Y:2017 06 2017 USE SOLAR HEAT TO MAKE ELECTRICTY $147,360 $665,154 Not Implemented