IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,239

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0238 # 01 Y:1992 01 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $700 $250 Implemented
CO0238 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $250 $220 Implemented
CO0238 # 03 Y:1992 03 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $300 $450 Implemented
CO0238 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,540 $820 Implemented
CO0238 # 05 Y:1992 05 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $540 $200 Implemented
CO0238 # 06 Y:1992 06 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $320 $1,000 Implemented
CO0238 # 07 Y:1992 07 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $250 $1,060 Implemented
CO0234 # 01 Y:1992 01 1992 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $810 $250 Implemented
CO0234 # 02 Y:1992 02 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,000 $230 Implemented
CO0234 # 03 Y:1992 03 1992 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $505 $150 Implemented
CO0234 # 04 Y:1992 04 1992 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $85 $10,700 Implemented
CO0234 # 05 Y:1992 05 1992 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $390 $1,380 Implemented
CO0234 # 06 Y:1992 06 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $360 $1,480 Implemented
OR0136 # 01 Y:1992 01 1992 INSULATE BARE EQUIPMENT $597 $465 Implemented
OR0136 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $413 $1,000 Implemented
OR0136 # 03 Y:1992 03 1992 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $585 $1,500 Not Implemented
OR0136 # 04 Y:1992 04 1992 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $126 $775 Not Implemented
OR0125 # 01 Y:1991 01 1991 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $18,739 $0 Implemented
OR0125 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,392 $6,072 Implemented
OR0125 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $12,391 $35,042 Implemented
OR0125 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,743 $0 Implemented
OR0125 # 05 Y:1991 05 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,934 $83,040 Implemented
RU0133 # 01 Y:1991 01 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,491 $0 Implemented
RU0133 # 02 Y:1991 02 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,929 $0 Implemented
RU0133 # 03 Y:1991 03 1991 INSULATE BARE EQUIPMENT $460 $166 Implemented