IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,299

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CL2102 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,814 $3,180 Implemented
CL2102 # 02 Y:2021 02 2021 INSTALL OCCUPANCY SENSORS $322 $453 Not Implemented
CL2102 # 03 Y:2021 03 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,176 $2,846 Implemented
CL2102 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $6,049 $0 Implemented
UK2005 # 01 Y:2021 01 2021 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,303 $5,660 n/a
UK2005 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $802 $0 n/a
UK2005 # 03 Y:2021 03 2021 USE RADIANT HEATER FOR SPOT HEATING $5,104 $3,740 n/a
UK2005 # 04 Y:2021 04 2021 UPGRADE CONTROLS ON COMPRESSORS $9,505 $5,250 n/a
UK2005 # 05 Y:2021 05 2021 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $6,176 $80 n/a
UK2005 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,065 $3,580 n/a
UK2005 # 07 Y:2021 07 2021 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $21,605 $3,000 n/a
UK2005 # 08 Y:2021 08 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $66,411 $240,000 n/a
UK2005 # 09 Y:2021 09 2021 INSULATE BARE EQUIPMENT $4,993 $6,721 n/a
UF0556 # 01 Y:2020 01 2020 USE SOLAR HEAT TO MAKE ELECTRICTY $33,420 $174,290 Implemented
UF0556 # 02 Y:2020 02 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $4,365 $10,575 Not Implemented
UF0556 # 03 Y:2020 03 2020 INSTALL SKYLIGHTS $2,253 $4,190 Implemented
UF0556 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $1,675 $2,955 Implemented
UF0556 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,165 $421 Implemented
UF0556 # 06 Y:2020 06 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $905 $3,206 Not Implemented
SF0563 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,685 $200 Not Implemented
SF0563 # 02 Y:2020 02 2020 INSULATE BARE EQUIPMENT $339 $227 Implemented
SF0563 # 03 Y:2020 03 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,582 $2,866 Implemented
SF0563 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,879 $17,947 Implemented
SF0563 # 05 Y:2020 05 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,998 $71,975 Implemented
WV0601 # 01 Y:2020 01 2020 USE EVAPORATION TO CONCENTRATE MATERIAL $24,050 $90,000 Implemented