IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,243

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0097 # 09 Y:2017 09 2017 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $140 $160 Not Implemented
UU0115 # 01 Y:2017 01 2017 DISCONNECT BALLASTS $296 $0 Implemented
UU0115 # 02 Y:2017 02 2017 INSTALL OCCUPANCY SENSORS $444 $438 Implemented
UU0115 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,840 $0 Implemented
UU0115 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $931 $2,500 Not Implemented
UU0115 # 05 Y:2017 05 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,766 $0 Implemented
AM0723 # 01 Y:2017 01 2017 OPTIMIZE PLANT POWER FACTOR $12,900 $23,700 Implemented
AM0723 # 02 Y:2017 02 2017 USE DEMAND CONTROLLER OR LOAD SHEDDER $12,700 $0 Not Implemented
AM0723 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,600 $340 Implemented
AM0723 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,230 $2,500 Implemented
AM0723 # 05 Y:2017 05 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $10,380 $3,000 Implemented
AM0723 # 06 Y:2017 06 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,260 $3,480 Not Implemented
AM0723 # 07 Y:2017 07 2017 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,200 $0 Implemented
AM0723 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,230 $4,350 Implemented
AM0723 # 09 Y:2017 09 2017 USE SYNTHETIC LUBRICANT $860 $0 Not Implemented
AM0723 # 10 Y:2017 10 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $580 $980 Not Implemented
OR0682 # 01 Y:2017 01 2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $104,297 $70,000 Not Implemented
OR0682 # 02 Y:2017 02 2017 REPLACE BOILER $4,289 $23,625 Not Implemented
OR0682 # 03 Y:2017 03 2017 REPLACE BOILER $1,937 $9,815 Not Implemented
SF0494 # 01 Y:2016 01 2016 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,238 $0 Implemented
SF0494 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $270 $0 Implemented
SF0494 # 03 Y:2016 03 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $5,772 $2,510 Implemented
SF0494 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,469 $4,948 Implemented
SF0494 # 05 Y:2016 05 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,493 $5,050 Not Implemented
SF0494 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $567 $2,381 Implemented