Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
SIC 208 Beverages
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0328 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $302 $120 Not Implemented
MZ0328 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $1,438 $2,450 Not Implemented
MZ0328 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $2,047 $7,500 Not Implemented
MZ0328 # 01 Y:2022 01 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $57,088 $235,000 Not Implemented
MZ0231 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,265 $12,363 Implemented
MZ0231 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,949 $28,500 Implemented
MZ0231 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $3,785 $21,000 Implemented
MZ0231 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $20,503 $34,150 Implemented
MZ0231 # 06 Y:2017 06 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,438 $11,250 Implemented
MZ0231 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,356 $8,300 Not Implemented
MZ0231 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $713 $250 Implemented
MZ0231 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,125 $30 Implemented
MZ0056 # 03 Y:2010 03 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $2,784 $150 Not Implemented
MZ0056 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $4,969 $950 Not Implemented
MZ0056 # 01 Y:2010 01 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,032 $1,160 Not Implemented
MZ0056 # 07 Y:2010 07 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,340 $800 Not Implemented
MZ0056 # 06 Y:2010 06 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,900 $0 Not Implemented
MZ0056 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,237 $1,300 Not Implemented
MZ0056 # 10 Y:2010 10 2010 REPAIR OR REPLACE STEAM TRAPS $113,700 $100,000 Not Implemented
MZ0056 # 08 Y:2010 08 2010 RECOVER WASTE HEAT FROM EQUIPMENT $99,250 $80,000 Not Implemented
MZ0056 # 05 Y:2010 05 2010 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $2,072 $1,000 Not Implemented
MZ0056 # 04 Y:2010 04 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,352 $150 Not Implemented
MZ0053 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,207 $0 Implemented
MZ0053 # 10 Y:2010 10 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,916 $1,100 Implemented
MZ0053 # 11 Y:2010 11 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,987 $5,000 Implemented