Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
463
matching recommendationsSIC | 2084 | Wines, Brandy, And Brandy Spirits |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0328 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $302 | $120 | Not Implemented |
MZ0328 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $1,438 | $2,450 | Not Implemented |
MZ0328 # 02 Y:2022 | 02 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,047 | $7,500 | Not Implemented |
MZ0328 # 01 Y:2022 | 01 | 2022 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $57,088 | $235,000 | Not Implemented |
SF0580 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,463 | $18,200 | Implemented |
SF0580 # 03 Y:2021 | 03 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $69,715 | $64,882 | Not Implemented |
SF0580 # 02 Y:2021 | 02 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $12,288 | $1,410 | Not Implemented |
SF0580 # 01 Y:2021 | 01 | 2021 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $18,446 | $0 | Implemented |
SF0580 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $19,936 | $49,917 | Implemented |
SF0580 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $228 | $574 | Implemented |
SF0580 # 05 Y:2021 | 05 | 2021 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,242 | $2,702 | Implemented |
BS0153 # 01 Y:2021 | 01 | 2021 | INSTALL OCCUPANCY SENSORS | $30,759 | $3,726 | Not Implemented |
BS0153 # 02 Y:2021 | 02 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $36,134 | $5,961 | Not Implemented |
BS0153 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $733 | $490 | Not Implemented |
BS0153 # 04 Y:2021 | 04 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $98,310 | $307,800 | Not Implemented |
SF0570 # 11 Y:2021 | 11 | 2021 | USE SOLAR HEAT TO MAKE ELECTRICTY | $179,262 | $1,269,472 | Implemented |
SF0570 # 10 Y:2021 | 10 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,784 | $27,535 | Not Implemented |
SF0570 # 09 Y:2021 | 09 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $291 | $648 | Implemented |
SF0570 # 08 Y:2021 | 08 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,387 | $6,315 | Implemented |
SF0570 # 07 Y:2021 | 07 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $39,174 | $48,150 | Not Implemented |
SF0570 # 06 Y:2021 | 06 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $514 | $190 | Not Implemented |
SF0570 # 05 Y:2021 | 05 | 2021 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $106,544 | $31,500 | Not Implemented |
SF0570 # 04 Y:2021 | 04 | 2021 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $71,549 | $5,641 | Implemented |
SF0570 # 03 Y:2021 | 03 | 2021 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $149,399 | $10,195 | Implemented |
SF0570 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $27,893 | $0 | Implemented |