Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,749
matching recommendationsSIC | 2086 | Bottled And Canned Soft Drinks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0138 # 06 Y:2014 | 06 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $354 | $500 | Implemented |
TT0138 # 07 Y:2014 | 07 | 2014 | OPTIMIZE PLANT POWER FACTOR | $6,063 | $18,225 | Implemented |
TT0138 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,143 | $8,000 | Not Implemented |
MA0717 # 01 Y:2013 | 01 | 2013 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $21,124 | $14,700 | Not Implemented |
MA0717 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,293 | $8,275 | Implemented |
MA0717 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,036 | $8,700 | Not Implemented |
MA0717 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,986 | $5,700 | Implemented |
MA0717 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,679 | $4,082 | Implemented |
AM0641 # 01 Y:2013 | 01 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $81,000 | $40,000 | Implemented |
AM0641 # 02 Y:2013 | 02 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $45,620 | $50,000 | Implemented |
AM0641 # 03 Y:2013 | 03 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $8,894 | $31,100 | Implemented |
AM0641 # 04 Y:2013 | 04 | 2013 | INSTALL OCCUPANCY SENSORS | $4,800 | $1,800 | Implemented |
AM0641 # 05 Y:2013 | 05 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,130 | $610 | Implemented |
AM0641 # 06 Y:2013 | 06 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,580 | $500 | Implemented |
AM0641 # 07 Y:2013 | 07 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,940 | $220 | Not Implemented |
AM0641 # 08 Y:2013 | 08 | 2013 | USE SYNTHETIC LUBRICANT | $1,980 | $0 | Not Implemented |
SD0471 # 01 Y:2013 | 01 | 2013 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $629,471 | $234,900 | Not Implemented |
SD0471 # 02 Y:2013 | 02 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $277,284 | $353,400 | Not Implemented |
SD0471 # 03 Y:2013 | 03 | 2013 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $92,696 | $131,400 | Not Implemented |
SD0471 # 04 Y:2013 | 04 | 2013 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $79,351 | $96,000 | Not Implemented |
SD0471 # 05 Y:2013 | 05 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $34,337 | $110,000 | Not Implemented |
SD0471 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $31,423 | $100,248 | Implemented |
SD0471 # 07 Y:2013 | 07 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $23,316 | $500 | Not Implemented |
SD0471 # 08 Y:2013 | 08 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $21,126 | $3,300 | Implemented |
SD0471 # 09 Y:2013 | 09 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $13,810 | $18,500 | Not Implemented |