IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

233

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0316 # 08 Y:2017 08 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,115 $18,100 Not Implemented
MI0316 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $10,816 $7,881 Implemented
MI0316 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,732 $1,660 Implemented
MI0316 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,854 $61,030 Implemented
MI0316 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $72,034 $39,216 Implemented
MI0316 # 01 Y:2017 01 2017 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $313,428 $142,400 Not Implemented
MI0316 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,887 $4,577 Not Implemented
MI0279 # 05 Y:2015 05 2015 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,141 $2,100 Implemented
MI0279 # 01 Y:2015 01 2015 INCREASE EFFICIENCY OF TRUCKS $30,426 $29,000 Not Implemented
MI0279 # 02 Y:2015 02 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $29,100 $80,000 Not Implemented
MI0279 # 03 Y:2015 03 2015 RECOVER AND REUSE COOLING WATER $12,134 $497 Implemented
MI0279 # 04 Y:2015 04 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,413 $12,060 Implemented
MI0279 # 06 Y:2015 06 2015 USE OPTIMUM THICKNESS INSULATION $4,666 $1,810 Implemented
MI0279 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,329 $40 Implemented
MI0279 # 09 Y:2015 09 2015 INSULATE BARE EQUIPMENT $1,612 $482 Implemented
MI0279 # 08 Y:2015 08 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,877 $2,520 Implemented
MI0279 # 13 Y:2015 13 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $634 $1,760 Implemented
MI0279 # 12 Y:2015 12 2015 USE PHOTOCELL CONTROLS $1,139 $480 Implemented
MI0279 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $1,456 $1,782 Not Implemented
MI0279 # 11 Y:2015 11 2015 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,317 $3,280 Not Implemented
UF0440 # 06 Y:2011 06 2011 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $136 $244 Not Implemented
UF0440 # 07 Y:2011 07 2011 INSTALL TURBULATORS $3,745 $3,750 Not Implemented
UF0440 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,493 $9,387 Not Implemented
UF0440 # 09 Y:2011 09 2011 INSTALL OCCUPANCY SENSORS $2,620 $243 Not Implemented
UF0440 # 10 Y:2011 10 2011 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $635 $0 Not Implemented