IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
Reset
SIC 2086 Bottled And Canned Soft Drinks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0796 # 01 Y:2024 01 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $733 $546 n/a
OR0796 # 02 Y:2024 02 2024 ADOPT IN-HOUSE MATERIAL GENERATION $86,946 $168,430 n/a
OR0796 # 03 Y:2024 03 2024 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $584 $2,239 n/a
OR0796 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $130,526 $1,312,500 n/a
BS0001 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $6,068 $12,300 Implemented
BS0001 # 02 Y:2012 02 2012 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $19,506 $35,200 Implemented
BS0001 # 03 Y:2012 03 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,703 $0 Implemented
BS0001 # 04 Y:2012 04 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,535 $1,894 Not Implemented
BS0001 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,664 $1,616 Implemented
BS0001 # 06 Y:2012 06 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,034 $200 Implemented
BS0001 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $160 Implemented
BS0001 # 08 Y:2012 08 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,474 $5,640 Not Implemented
BS0001 # 09 Y:2012 09 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,158 $2,282 Implemented