IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

147

matching recommendations
Reset
SIC 2091 Canned And Cured Fish And Seafoods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ORS001 # 03 Y:1999 03 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,190 $10,700 Implemented
ORS001 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,400 $16,800 Not Implemented
ORS001 # 05 Y:1999 05 1999 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $6,070 $0 Implemented
ORS001 # 06 Y:1999 06 1999 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,829 $700 Implemented
ORS001 # 07 Y:1999 07 1999 $519,000 $250,000 Not Implemented
ORS001 # 08 Y:1999 08 1999 $78,300 $175,000 Not Implemented
ORS001 # 09 Y:1999 09 1999 MINIMIZE WATER USAGE $1,960 $0 Implemented
UF0168 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,489 $20,613 Implemented
UF0168 # 02 Y:1997 02 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $414 $426 Implemented
UF0168 # 03 Y:1997 03 1997 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,842 $8,000 Not Implemented
UF0168 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,062 $1,350 Implemented
UF0168 # 05 Y:1997 05 1997 RECOVER WASTE HEAT FROM EQUIPMENT $3,369 $750 Not Implemented
UF0168 # 06 Y:1997 06 1997 CLEAN CONDENSER TUBES $5,814 $0 Implemented
UF0168 # 07 Y:1997 07 1997 $482,839 $1,600,000 Not Implemented
UF0168 # 08 Y:1997 08 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,296 $7,000 Implemented
UF0168 # 09 Y:1997 09 1997 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $23,400 $0 Not Implemented
ME0205 # 01 Y:1996 01 1996 $115,428 $0 Implemented
ME0205 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,183 $7,572 Implemented
ME0205 # 03 Y:1996 03 1996 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,380 $453 Not Implemented
ME0205 # 04 Y:1996 04 1996 INSULATE BARE EQUIPMENT $1,004 $2,112 Not Implemented
ME0205 # 05 Y:1996 05 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,306 $595 Not Implemented
ME0205 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $285 $200 Implemented
ME0205 # 07 Y:1996 07 1996 INSULATE BARE EQUIPMENT $244 $38 Implemented
ME0205 # 08 Y:1996 08 1996 INSULATE BARE EQUIPMENT $196 $270 Implemented
ME0205 # 09 Y:1996 09 1996 REPAIR AND ELIMINATE STEAM LEAKS $11,040 $200 Implemented