Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsSIC | 2096 | Potato Chips And Similar Snacks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0072 # 05 Y:1989 | 05 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $4,874 | $7,000 | Implemented |
AM0075 # 09 Y:1989 | 09 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $640 | $1,300 | Implemented |
AM0075 # 08 Y:1989 | 08 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $146 | $135 | Not Implemented |
AM0075 # 07 Y:1989 | 07 | 1989 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,085 | $1,500 | Implemented |
AM0075 # 06 Y:1989 | 06 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,895 | $270 | Implemented |
AM0075 # 05 Y:1989 | 05 | 1989 | INSULATE BARE EQUIPMENT | $2,845 | $2,500 | Not Implemented |
AM0075 # 04 Y:1989 | 04 | 1989 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $2,597 | $1,000 | Not Implemented |
AM0075 # 03 Y:1989 | 03 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,340 | $16,650 | Not Implemented |
AM0075 # 02 Y:1989 | 02 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,222 | $1,200 | Implemented |
AM0075 # 01 Y:1989 | 01 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $10,170 | $28,650 | Not Implemented |
OR0072 # 01 Y:1989 | 01 | 1989 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $134 | $200 | Implemented |
OR0072 # 02 Y:1989 | 02 | 1989 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $76 | $50 | Not Implemented |
OR0072 # 03 Y:1989 | 03 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $40 | $49 | Implemented |
OR0072 # 04 Y:1989 | 04 | 1989 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $2,002 | $3,264 | Not Implemented |
KU0285 # 09 Y:1989 | 09 | 1989 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $10,347 | $26,640 | Not Implemented |
KU0285 # 01 Y:1989 | 01 | 1989 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,382 | $1,500 | Implemented |
KU0285 # 02 Y:1989 | 02 | 1989 | REDESIGN PROCESS | $6,788 | $7,000 | Not Implemented |
KU0285 # 03 Y:1989 | 03 | 1989 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $1,165 | $2,000 | Not Implemented |
KU0285 # 04 Y:1989 | 04 | 1989 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,527 | $24,000 | Implemented |
KU0285 # 05 Y:1989 | 05 | 1989 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,478 | $22,600 | Implemented |
KU0285 # 06 Y:1989 | 06 | 1989 | INSTALL AUTOMATIC STACK DAMPER | $3,601 | $7,600 | Implemented |
KU0285 # 07 Y:1989 | 07 | 1989 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $906 | $2,500 | Implemented |
KU0285 # 08 Y:1989 | 08 | 1989 | RECOVER AND REUSE COOLING WATER | $16,548 | $2,500 | Implemented |
KU0285 # 11 Y:1989 | 11 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $39,539 | $50,000 | Implemented |
KU0285 # 10 Y:1989 | 10 | 1989 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $26,087 | $60,000 | Not Implemented |