Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
106
matching recommendationsSIC | 2098 | Macaroni And Spaghetti |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0257 # 11 Y:2000 | 11 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $7,188 | $3,010 | Implemented |
IA0257 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $660 | $25 | Not Implemented |
IA0257 # 06 Y:2000 | 06 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $889 | $369 | Implemented |
IA0257 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $396 | $60 | Implemented |
IA0257 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,478 | $0 | Implemented |
IA0257 # 10 Y:2000 | 10 | 2000 | INSTALL AUTOMATIC PACKING EQUIPMENT | $234,828 | $126,125 | Not Implemented |
IA0257 # 02 Y:2000 | 02 | 2000 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,420 | $254 | Not Implemented |
IA0257 # 09 Y:2000 | 09 | 2000 | RECOVER AND REUSE COOLING WATER | $23,394 | $15,250 | Implemented |
IA0257 # 08 Y:2000 | 08 | 2000 | MINIMIZE WATER USAGE | $28,444 | $19,000 | Not Implemented |
IA0257 # 07 Y:2000 | 07 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $81,900 | $150 | Implemented |
IA0257 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $969 | $60 | Implemented |
OR0302 # 07 Y:1997 | 07 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $4,077 | $1,210 | Not Implemented |
OR0302 # 12 Y:1997 | 12 | 1997 | SELL / OFFER BY-PRODUCT AS ANIMAL FEED | $5,988 | $300 | Not Implemented |
OR0302 # 11 Y:1997 | 11 | 1997 | ELIMINATE/REDUCE AN OPERATION | $7,267 | $420 | Implemented |
OR0302 # 10 Y:1997 | 10 | 1997 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $36,223 | $34,615 | Implemented |
OR0302 # 06 Y:1997 | 06 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,613 | $1,000 | Not Implemented |
OR0302 # 04 Y:1997 | 04 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,448 | $130,000 | Implemented |
OR0302 # 05 Y:1997 | 05 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,141 | $8,464 | Implemented |
OR0302 # 01 Y:1997 | 01 | 1997 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $370,800 | $345,000 | Not Implemented |
OR0302 # 08 Y:1997 | 08 | 1997 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,300 | $7,380 | Not Implemented |
OR0302 # 09 Y:1997 | 09 | 1997 | OPTIMIZE PLANT POWER FACTOR | $2,410 | $3,200 | Not Implemented |
OR0302 # 02 Y:1997 | 02 | 1997 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $78,667 | $5,000 | Implemented |
OR0302 # 03 Y:1997 | 03 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $25,630 | $73,000 | Implemented |
DS0072 # 03 Y:1996 | 03 | 1996 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $1,689 | $1,110 | Implemented |
DS0072 # 04 Y:1996 | 04 | 1996 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $5,139 | $10,000 | Not Implemented |