IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,239

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0492 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $710 $700 Not Implemented
GT0492 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $1,450 $630 Not Implemented
GT0492 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,990 $58,000 Implemented
GT0492 # 09 Y:1993 09 1993 DISCONNECT BALLASTS $980 $1,200 Implemented
GT0492 # 10 Y:1993 10 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,860 $5,700 Not Implemented
MA0273 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $35,663 $30,400 Implemented
MA0273 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,496 $22,778 Not Implemented
MA0273 # 03 Y:1993 03 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,038 $0 Not Implemented
MA0273 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $884 $712 Not Implemented
MA0273 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $520 $120 Implemented
MA0273 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $26 $6 Implemented
TN0493 # 01 Y:1993 01 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $5,022 $565 Implemented
TN0493 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,264 $845 Implemented
TN0493 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $5,964 $316 Not Implemented
TN0493 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,245 $0 Not Implemented
TN0493 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,136 $860 Implemented
NC0001 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,139 $1,577 Not Implemented
NC0001 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,100 $500 Implemented
NC0001 # 03 Y:1993 03 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $745 $300 Implemented
NC0001 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $588 $10 Implemented
NC0001 # 05 Y:1993 05 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $162 $100 Implemented
NC0001 # 06 Y:1993 06 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,120 $4,800 Not Implemented
OK0397 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,633 $3,692 Implemented
OK0397 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,271 $2,404 Implemented
OK0397 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,531 $11,150 Implemented