IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,268

matching recommendations
Reset
SIC 22 Textile Mill Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0295 # 07 Y:1986 07 1986 ADJUST VENTS TO MINIMIZE ENERGY USE $4,435 $1,000 Not Implemented
GT0295 # 08 Y:1986 08 1986 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $6,760 $0 Not Implemented
GT0295 # 09 Y:1986 09 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,440 $0 Not Implemented
TN0285 # 01 Y:1986 01 1986 REPAIR AND ELIMINATE STEAM LEAKS $26,651 $490 Implemented
TN0285 # 02 Y:1986 02 1986 REPAIR AND ELIMINATE STEAM LEAKS $20,398 $1,400 Implemented
TN0285 # 03 Y:1986 03 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $9,667 $1,955 Implemented
TN0285 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,628 $0 Implemented
TN0285 # 05 Y:1986 05 1986 INSULATE BARE EQUIPMENT $4,585 $1,288 Not Implemented
TN0285 # 06 Y:1986 06 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,677 $6,720 Implemented
TN0285 # 07 Y:1986 07 1986 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,825 $1,480 Implemented
TN0285 # 08 Y:1986 08 1986 INSULATE BARE EQUIPMENT $3,692 $1,739 Not Implemented
TN0285 # 09 Y:1986 09 1986 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,479 $1,240 Not Implemented
TN0285 # 10 Y:1986 10 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,515 $0 Implemented
MA0068 # 01 Y:1986 01 1986 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $10,397 $4,021 Not Implemented
MA0068 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,205 $165 Not Implemented
MA0068 # 03 Y:1986 03 1986 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,226 $100 Implemented
MA0068 # 04 Y:1986 04 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,103 $20,000 Not Implemented
MA0068 # 05 Y:1986 05 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,940 $50 Implemented
MA0068 # 06 Y:1986 06 1986 DIRECT WARMEST AIR TO COMBUSTION INTAKE $3,079 $1,500 Not Implemented
GT0292 # 01 Y:1986 01 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,500 $0 Implemented
GT0292 # 02 Y:1986 02 1986 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $18,800 $15,000 Implemented
GT0292 # 03 Y:1986 03 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $260 $780 Implemented
GT0292 # 04 Y:1986 04 1986 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $15,300 $22,400 Implemented
GT0292 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,750 $14,700 Implemented
GT0292 # 06 Y:1986 06 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $517 $1,993 Implemented