IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
Reset
SIC 222 Broadwoven Fabric Mills, Manmade
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0319 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,640 $450 Not Implemented
AM0319 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,645 $900 Not Implemented
AM0319 # 03 Y:1998 03 1998 ADD AREA LIGHTING SWITCHES $5,110 $1,700 Not Implemented
AM0319 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,400 $30 Not Implemented
AM0319 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,960 $490 Not Implemented
AM0319 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $445 $405 Not Implemented
AM0237 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,890 $5,000 Implemented
AM0237 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,400 $41 Implemented
AM0237 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $2,700 $620 Implemented
AM0237 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,700 $1,000 Implemented
AM0237 # 05 Y:1995 05 1995 INSTALL SKYLIGHTS $1,300 $1,400 Not Implemented
AM0237 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $925 $550 Implemented
AM0237 # 07 Y:1995 07 1995 USE SYNTHETIC LUBRICANT $915 $0 Implemented
AM0237 # 08 Y:1995 08 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $910 $1,100 Implemented