Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
17
matching recommendationsSIC | 225 | Knitting Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0273 # 02 Y:1993 | 02 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,496 | $22,778 | Not Implemented |
MA0273 # 03 Y:1993 | 03 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,038 | $0 | Not Implemented |
MA0273 # 04 Y:1993 | 04 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $884 | $712 | Not Implemented |
MA0273 # 05 Y:1993 | 05 | 1993 | INSULATE BARE EQUIPMENT | $520 | $120 | Implemented |
MA0273 # 06 Y:1993 | 06 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $26 | $6 | Implemented |
MA0273 # 01 Y:1993 | 01 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $35,663 | $30,400 | Implemented |
TN0493 # 05 Y:1993 | 05 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,136 | $860 | Implemented |
TN0493 # 04 Y:1993 | 04 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,245 | $0 | Not Implemented |
TN0493 # 03 Y:1993 | 03 | 1993 | INSULATE BARE EQUIPMENT | $5,964 | $316 | Not Implemented |
TN0493 # 02 Y:1993 | 02 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,264 | $845 | Implemented |
TN0493 # 01 Y:1993 | 01 | 1993 | INSTALL / REPAIR INSULATION ON STEAM LINES | $5,022 | $565 | Implemented |
NC0001 # 06 Y:1993 | 06 | 1993 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,120 | $4,800 | Not Implemented |
NC0001 # 05 Y:1993 | 05 | 1993 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $162 | $100 | Implemented |
NC0001 # 04 Y:1993 | 04 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $588 | $10 | Implemented |
NC0001 # 03 Y:1993 | 03 | 1993 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $745 | $300 | Implemented |
NC0001 # 02 Y:1993 | 02 | 1993 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,100 | $500 | Implemented |
NC0001 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,139 | $1,577 | Not Implemented |