IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
SIC 2258 Lace & Warp Knit Fabric Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
HO0078 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,943 $5,010 Implemented
HO0078 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,524 $3,277 Implemented
HO0078 # 03 Y:1994 03 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,930 $5,390 Implemented
HO0078 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,509 $800 Not Implemented
HO0078 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $253 $113 Implemented
MA0273 # 01 Y:1993 01 1993 RECOVER WASTE HEAT FROM EQUIPMENT $35,663 $30,400 Implemented
MA0273 # 06 Y:1993 06 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $26 $6 Implemented
MA0273 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $520 $120 Implemented
MA0273 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $884 $712 Not Implemented
MA0273 # 03 Y:1993 03 1993 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,038 $0 Not Implemented
MA0273 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,496 $22,778 Not Implemented
TN0493 # 01 Y:1993 01 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $5,022 $565 Implemented
TN0493 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,264 $845 Implemented
TN0493 # 03 Y:1993 03 1993 INSULATE BARE EQUIPMENT $5,964 $316 Not Implemented
TN0493 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,245 $0 Not Implemented
TN0493 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,136 $860 Implemented
NC0001 # 02 Y:1993 02 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,100 $500 Implemented
NC0001 # 05 Y:1993 05 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $162 $100 Implemented
NC0001 # 04 Y:1993 04 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $588 $10 Implemented
NC0001 # 03 Y:1993 03 1993 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $745 $300 Implemented
NC0001 # 06 Y:1993 06 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,120 $4,800 Not Implemented
NC0001 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,139 $1,577 Not Implemented
AT0012 # 02 Y:1985 02 1985 INSTALL TIMERS AND/OR THERMOSTATS $6,139 $275 Implemented
AT0012 # 03 Y:1985 03 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,984 $4,950 Implemented
AT0012 # 04 Y:1985 04 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,514 $343 Implemented