IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
SIC 226 Textile Finishing, Except Wool
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0408 # 08 Y:1998 08 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,232 $250,000 Implemented
MA0408 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $644 $513 Implemented
MA0408 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,487 $2,675 Not Implemented
MA0408 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,735 $100 Implemented
MA0408 # 04 Y:1998 04 1998 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,939 $5,520 Not Implemented
MA0408 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,188 $1,000 Implemented
MA0408 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,625 $8,625 Not Implemented
MA0408 # 01 Y:1998 01 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $99,832 $87,100 Not Implemented
MA0405 # 05 Y:1997 05 1997 OPTIMIZE PLANT POWER FACTOR $2,412 $5,275 Not Implemented
MA0405 # 08 Y:1997 08 1997 PREHEAT COMBUSTION AIR WITH WASTE HEAT $531 $600 Not Implemented
MA0405 # 07 Y:1997 07 1997 MINIMIZE WATER USAGE $1,049 $2,125 Not Implemented
MA0405 # 06 Y:1997 06 1997 INSTALL OCCUPANCY SENSORS $1,335 $1,620 Implemented
MA0405 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,631 $266 Not Implemented
MA0405 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,177 $28,900 Implemented
MA0405 # 02 Y:1997 02 1997 MINIMIZE WATER USAGE $25,165 $3,413 Implemented
MA0405 # 01 Y:1997 01 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $110,455 $131,100 Not Implemented
MA0388 # 01 Y:1997 01 1997 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $95,807 $47,527 Implemented
MA0388 # 08 Y:1997 08 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $32,204 $55,094 Implemented
MA0388 # 07 Y:1997 07 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $1,002 $0 Implemented
MA0388 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $604 $272 Implemented
MA0388 # 05 Y:1997 05 1997 RECOVER WASTE HEAT FROM EQUIPMENT $1,406 $858 Not Implemented
MA0388 # 04 Y:1997 04 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $7,561 $18,983 Not Implemented
MA0388 # 03 Y:1997 03 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,884 $4,925 Implemented
MA0388 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,382 $1,100 Not Implemented