IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

37

matching recommendations
Reset
SIC 227 Carpets And Rugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CI0016 # 02 Y:2023 02 2023 RECOVER WASTE HEAT FROM EQUIPMENT $49,228 $6,000 n/a
CI0016 # 03 Y:2023 03 2023 RECOVER WASTE HEAT FROM EQUIPMENT $36,111 $6,000 n/a
CI0016 # 04 Y:2023 04 2023 RECOVER WASTE HEAT FROM EQUIPMENT $28,538 $5,000 n/a
CI0016 # 05 Y:2023 05 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,733 $6,270 n/a
CI0016 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,065 $1,500 n/a
CI0016 # 07 Y:2023 07 2023 REPLACE BOILER $11,941 $45,000 n/a
CI0016 # 08 Y:2023 08 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,511 $0 n/a
CI0016 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $175,385 $609,600 n/a
SD0504 # 02 Y:2010 02 2010 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $188,550 $211,240 Not Implemented
SD0504 # 04 Y:2010 04 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,360 $7,010 Not Implemented
SD0504 # 05 Y:2010 05 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,983 $11,585 Not Implemented
SD0504 # 03 Y:2010 03 2010 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $14,846 $20,000 Not Implemented
SD0504 # 01 Y:2010 01 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,200 $12,725 Not Implemented
SD0103 # 05 Y:1995 05 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $34,998 $20,000 Not Implemented
SD0103 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,708 $1,432 Implemented
SD0103 # 06 Y:1995 06 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $27,668 $0 Implemented
SD0103 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $65,923 $63,000 Not Implemented
SD0103 # 03 Y:1995 03 1995 COVER OPEN TANKS $62,441 $45,735 Not Implemented
SD0103 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $10,901 $6,835 Not Implemented
SD0103 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $13,776 $14,090 Implemented
SD0102 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,106 $13,510 Implemented
SD0102 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $170 $81 Not Implemented
SD0102 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $3,627 $3,728 Not Implemented
SD0102 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,830 $11,141 Implemented
SD0102 # 05 Y:1995 05 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $11,205 $9,725 Not Implemented