IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

460

matching recommendations
Reset
SIC 2273 Carpets And Rugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2426 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $78,312 $475,144 n/a
KS2426 # 07 Y:2024 07 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,143 $67,309 n/a
KS2426 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $7,670 $12,820 n/a
KS2426 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,414 $62,011 n/a
KS2426 # 04 Y:2024 04 2024 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $383 $728 n/a
KS2426 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,733 $150 n/a
KS2426 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,975 $5,960 n/a
KS2317 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,385 $90 n/a
KS2317 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,229 $5,480 n/a
KS2317 # 03 Y:2023 03 2023 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $563 $411 n/a
KS2317 # 04 Y:2023 04 2023 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $1,851 $1,638 n/a
KS2317 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,312 $31,554 n/a
KS2317 # 06 Y:2023 06 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $251 $296 n/a
KS2317 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,384 $459,169 n/a
KS2313 # 03 Y:2023 03 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $28,388 $6,340 Not Implemented
KS2313 # 04 Y:2023 04 2023 COMBINE UTILITY METERS $11,545 $33,000 Implemented
KS2313 # 05 Y:2023 05 2023 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $106,263 $627,000 Not Implemented
KS2313 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $65,144 $514,950 Not Implemented
KS2313 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,149 $29,920 Implemented
KS2313 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,937 $60 Implemented
GT0933 # 03 Y:2019 03 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $199 $213 Implemented
GT0933 # 01 Y:2019 01 2019 INSTALL HEAT PIPES / RAISE COOLING SETPOINT $10,455 $250 Implemented
GT0933 # 02 Y:2019 02 2019 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $23,854 $13,713 Not Implemented
GT0933 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $4,386 $6,741 Not Implemented
GT0933 # 07 Y:2019 07 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $71,526 $507,835 Not Implemented