IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 232 Men's And Boys' Furnishings, Work Clothing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0021 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,250 $4,200 Implemented
MI0021 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,275 $7 Not Implemented
MI0021 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $3,634 $113 Not Implemented
MI0021 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,770 $312 Implemented
MI0021 # 01 Y:2001 01 2001 METER WASTE WATER $13,904 $3,650 Not Implemented
UF0017 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,928 $669 Not Implemented
UF0016 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,132 $1,000 Implemented
UF0016 # 05 Y:1992 05 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,151 $6,110 Implemented
UF0016 # 04 Y:1992 04 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,664 $7,280 Not Implemented
UF0016 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $186 $3,965 Implemented
UF0016 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $5,883 $13,275 Not Implemented
UF0016 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,022 $1,895 Not Implemented
UF0017 # 07 Y:1992 07 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $670 $2,125 Not Implemented
UF0019 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,388 $2,380 Not Implemented
UF0017 # 05 Y:1992 05 1992 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,192 $8,374 Not Implemented
UF0017 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $4,712 $4,000 Not Implemented
UF0017 # 03 Y:1992 03 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $60 $870 Not Implemented
UF0017 # 02 Y:1992 02 1992 INSTALL SPECTRAL REFLECTORS / DELAMP $2,525 $14,685 Not Implemented
UF0017 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $741 $731 Not Implemented
UF0019 # 08 Y:1992 08 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,879 $6,854 Not Implemented
UF0019 # 07 Y:1992 07 1992 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $338 $1,500 Not Implemented
UF0019 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,174 $2,000 Not Implemented
UF0019 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $599 $9,321 Not Implemented
UF0019 # 04 Y:1992 04 1992 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $16,213 $10,220 Not Implemented
UF0019 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $798 $8,466 Not Implemented