IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
SIC 232 Men's And Boys' Furnishings, Work Clothing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0067 # 08 Y:1982 08 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $798 $950 Not Implemented
KU0067 # 02 Y:1982 02 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,254 $0 Implemented
KU0067 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,109 $4,780 Not Implemented
TN0142 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $472 $500 Not Implemented
KU0067 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $973 $139 Implemented
KU0067 # 04 Y:1982 04 1982 OPTIMIZE PLANT POWER FACTOR $1,623 $2,350 Not Implemented
KU0067 # 05 Y:1982 05 1982 INSULATE BARE EQUIPMENT $675 $100 Not Implemented
KU0067 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $420 $400 Not Implemented
KU0067 # 07 Y:1982 07 1982 INSTALL AUTOMATIC STACK DAMPER $851 $1,630 Not Implemented
KU0067 # 09 Y:1982 09 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $173 $31 Implemented
TN0142 # 01 Y:1982 01 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $253 $1,850 Not Implemented
TN0142 # 02 Y:1982 02 1982 USE OPTIMUM THICKNESS INSULATION $281 $176 Not Implemented
TN0125 # 04 Y:1982 04 1982 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,260 $17,250 Not Implemented
TN0125 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $0 Not Implemented
TN0125 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,900 $0 Not Implemented
TN0125 # 01 Y:1982 01 1982 INSTALL SET-BACK TIMERS $6,284 $0 Not Implemented
TN0119 # 02 Y:1982 02 1982 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,150 $2,500 Not Implemented
GT0125 # 05 Y:1982 05 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $748 $359 Implemented
GT0125 # 04 Y:1982 04 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $648 $0 Implemented
GT0125 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,124 $6,215 Implemented
GT0125 # 02 Y:1982 02 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,067 $400 Implemented
GT0125 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,931 $1,900 Implemented
TN0119 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $916 $1,300 Not Implemented
TN0119 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,158 $100 Not Implemented
TN0109 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $72 Not Implemented