IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 2339 Women's, Misses', and Juniors' Outerwear, Not Elsewhere Classified
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AT0071 # 03 Y:1987 03 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $377 $500 Implemented
AT0071 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $168 $0 Implemented
AT0071 # 05 Y:1987 05 1987 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $42 $46 Implemented
AT0071 # 06 Y:1987 06 1987 USE DEMAND CONTROLLER OR LOAD SHEDDER $423 $2,000 Implemented
AT0072 # 01 Y:1987 01 1987 REDESIGN PROCESS $25,782 $5,000 Implemented
AT0072 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,543 $2,238 Implemented
AT0072 # 03 Y:1987 03 1987 IMPROVE LUBRICATION PRACTICES $1,091 $0 Implemented
AT0072 # 04 Y:1987 04 1987 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $625 $0 Implemented
AT0072 # 05 Y:1987 05 1987 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $19,403 $8,000 Implemented
AT0072 # 06 Y:1987 06 1987 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,023 $5,000 Implemented
AT0072 # 07 Y:1987 07 1987 INSULATE BARE EQUIPMENT $335 $150 Implemented
AT0072 # 08 Y:1987 08 1987 RECOVER WASTE HEAT FROM EQUIPMENT $950 $3,000 Not Implemented
AT0072 # 09 Y:1987 09 1987 INSULATE BARE EQUIPMENT $432 $50 Implemented
AT0072 # 10 Y:1987 10 1987 INSULATE BARE EQUIPMENT $583 $150 Implemented
KU0219 # 01 Y:1987 01 1987 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,778 $2,698 Implemented
KU0219 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,013 $3,814 Not Implemented
KU0219 # 03 Y:1987 03 1987 INSTALL TIMERS AND/OR THERMOSTATS $1,516 $100 Implemented
KU0219 # 04 Y:1987 04 1987 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $498 $1,012 Implemented
KU0219 # 05 Y:1987 05 1987 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $181 $400 Implemented
KU0219 # 06 Y:1987 06 1987 INSTALL AUTOMATIC STACK DAMPER $351 $400 Not Implemented
KU0219 # 07 Y:1987 07 1987 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $109 $0 Implemented
OK0200 # 01 Y:1986 01 1986 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $1,274 $5,000 Not Implemented
OK0200 # 02 Y:1986 02 1986 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $3,679 $4,000 Implemented
OK0200 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,249 $7,000 Not Implemented
OK0200 # 04 Y:1986 04 1986 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $924 $2,355 Implemented