Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
842
matching recommendationsSIC | 239 | Misc. Fabricated Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0017 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $90,004 | $0 | n/a |
CC0017 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $139,613 | $1,192,963 | n/a |
CC0017 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,445 | $0 | n/a |
CC0017 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,997 | $8,484 | n/a |
CC0017 # 05 Y:2023 | 05 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,525 | $0 | n/a |
CC0017 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $4,836 | $6,196 | n/a |
LE0541 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $856 | $0 | Not Implemented |
LE0541 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $4,210 | Implemented |
LE0541 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,345 | $4,836 | Not Implemented |
LE0541 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $2,400 | Implemented |
LE0541 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,586 | $8,304 | Not Implemented |
LE0541 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,461 | $100 | Implemented |
MU0014 # 09 Y:2022 | 09 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $91 | $261 | Not Implemented |
MU0014 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,680 | $4,307 | Implemented |
MU0014 # 03 Y:2022 | 03 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,023 | $0 | Implemented |
MU0014 # 04 Y:2022 | 04 | 2022 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $6,530 | $0 | Not Implemented |
MU0014 # 06 Y:2022 | 06 | 2022 | USE OPTIMUM TEMPERATURE | $1,469 | $155 | Not Implemented |
MU0014 # 08 Y:2022 | 08 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $109 | $0 | Implemented |
MU0014 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,107 | $30,064 | Not Implemented |
MU0014 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,203 | $4,540 | Not Implemented |
MU0014 # 07 Y:2022 | 07 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $414 | $349 | Not Implemented |
CC0003 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,652 | $12,041 | n/a |
CC0003 # 04 Y:2022 | 04 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $5,980 | $0 | n/a |
CC0003 # 02 Y:2022 | 02 | 2022 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,633 | $0 | n/a |
CC0003 # 03 Y:2022 | 03 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $990 | $0 | n/a |