Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
862
matching recommendationsSIC | 239 | Misc. Fabricated Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2509 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $1,146 | $4,527 | n/a |
UL2509 # 06 Y:2025 | 06 | 2025 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $25,358 | $30,000 | n/a |
UL2509 # 02 Y:2025 | 02 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $391 | $0 | n/a |
UL2509 # 05 Y:2025 | 05 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $35,838 | $43,234 | n/a |
UL2509 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,434 | $735 | n/a |
UL2509 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $169,510 | $2,499,627 | n/a |
UU0270 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,940 | $105,710 | n/a |
UU0270 # 05 Y:2025 | 05 | 2025 | PAY UTILITY BILLS ON TIME | $700 | $1,650 | n/a |
UU0270 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,825 | $17,730 | n/a |
UU0270 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,350 | $15,900 | n/a |
UU0270 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $17,175 | $12,320 | n/a |
UU0270 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $645 | $820 | n/a |
UL2502 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,066 | $0 | n/a |
UL2502 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $753 | $155 | n/a |
UL2502 # 07 Y:2025 | 07 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $74,556 | $570,771 | n/a |
UL2502 # 08 Y:2025 | 08 | 2025 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $8,276 | $1,800 | n/a |
UL2502 # 06 Y:2025 | 06 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,639 | $0 | n/a |
UL2502 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,810 | $2,205 | n/a |
UL2502 # 03 Y:2025 | 03 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,331 | $7,280 | n/a |
UL2502 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $94 | $35 | n/a |
CC0017 # 05 Y:2023 | 05 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,525 | $0 | n/a |
CC0017 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,445 | $0 | n/a |
CC0017 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $4,836 | $6,196 | n/a |
CC0017 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $90,004 | $0 | n/a |
CC0017 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,997 | $8,484 | n/a |