IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

149

matching recommendations
Reset
SIC 2399 Fabricated Textile Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2105 # 03 Y:2021 03 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,367 $675 Implemented
LS2105 # 01 Y:2021 01 2021 INSTALL TIMERS AND/OR THERMOSTATS $1,466 $100 Implemented
LS2105 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,725 $9,408 Implemented
LS2105 # 06 Y:2021 06 2021 USE SOLAR HEAT TO MAKE ELECTRICTY $40,438 $646,020 Not Implemented
LS2105 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $455 $50 Not Implemented
LS2105 # 05 Y:2021 05 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $133 $580 Implemented
CL1705 # 01 Y:2017 01 2017 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $148,148 $211,152 Not Implemented
CL1705 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $95,734 $244,620 Not Implemented
CL1705 # 03 Y:2017 03 2017 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $15,929 $3,050 Not Implemented
CL1705 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,097 $900 Not Implemented
NC0585 # 09 Y:2017 09 2017 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,023 $500 Implemented
NC0585 # 05 Y:2017 05 2017 DISCONNECT BALLASTS $307 $225 Implemented
NC0585 # 10 Y:2017 10 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $286 $100 Implemented
NC0585 # 12 Y:2017 12 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $754 $100 Implemented
NC0585 # 11 Y:2017 11 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,207 $100 Implemented
NC0585 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $136 $521 Implemented
NC0585 # 02 Y:2017 02 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,291 $100 Implemented
NC0585 # 08 Y:2017 08 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $100 Implemented
NC0585 # 07 Y:2017 07 2017 USE PHOTOCELL CONTROLS $47 $50 Implemented
NC0585 # 01 Y:2017 01 2017 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,989 $500 Implemented
NC0585 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $560 $2,000 Implemented
NC0585 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,830 $5,000 Implemented
DL0115 # 02 Y:2013 02 2013 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,900 $350 Implemented
DL0115 # 01 Y:2013 01 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $3,106 $0 Implemented
DL0115 # 09 Y:2013 09 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,710 $8,485 Implemented