Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,223
matching recommendationsSIC | 24 | Lumber And Wood Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0020 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,898 | $9,577 | n/a |
SJ0020 # 03 Y:2024 | 03 | 2024 | INSTALL OCCUPANCY SENSORS | $156 | $358 | n/a |
SJ0020 # 08 Y:2024 | 08 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,868 | $15,989 | n/a |
SJ0020 # 07 Y:2024 | 07 | 2024 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $2,380 | $0 | n/a |
SJ0020 # 06 Y:2024 | 06 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,851 | $0 | n/a |
SJ0020 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,344 | $0 | n/a |
SJ0020 # 04 Y:2024 | 04 | 2024 | INSTALL OCCUPANCY SENSORS | $178 | $770 | n/a |
UW2408 # 01 Y:2024 | 01 | 2024 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,069 | $103,000 | n/a |
UW2408 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $116,105 | $13,500 | n/a |
UW2408 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,014 | $0 | n/a |
UW2408 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,306 | $2,080 | n/a |
UW2408 # 05 Y:2024 | 05 | 2024 | OPTIMIZE PLANT POWER FACTOR | $45,697 | $89,919 | n/a |
UW2408 # 06 Y:2024 | 06 | 2024 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $35,732 | $2,619 | n/a |
UW2408 # 07 Y:2024 | 07 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $34,834 | $133,560 | n/a |
UW2408 # 08 Y:2024 | 08 | 2024 | INSULATE FEEDWATER TANK | $2,901 | $290 | n/a |
UW2408 # 09 Y:2024 | 09 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $61,411 | $421,830 | n/a |
UW2408 # 10 Y:2024 | 10 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $145,176 | $144,799 | n/a |
LT8396 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,001 | $2,360 | n/a |
LT8396 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $7,412 | $31,808 | n/a |
LT8396 # 03 Y:2024 | 03 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,479 | $1,067 | n/a |
KS2427 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,324 | $5,480 | n/a |
KS2427 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,498 | $453,376 | n/a |
KS2427 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,216 | $90 | n/a |
KS2427 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM THICKNESS INSULATION | $9,550 | $6,688 | n/a |
KS2427 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $69,076 | $156,917 | n/a |