IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,165

matching recommendations
Reset
SIC 2431 Millwork
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0051 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,549 $3,320 Implemented
SD0051 # 03 Y:1993 03 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $223 $20 Not Implemented
SD0051 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $544 $80 Not Implemented
SD0051 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $102 $0 Implemented
SD0051 # 06 Y:1993 06 1993 INSTALL SET-BACK TIMERS $771 $1,080 Implemented
SD0051 # 07 Y:1993 07 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $1,314 $2,080 Implemented
SD0051 # 08 Y:1993 08 1993 USE PHOTOCELL CONTROLS $907 $1,715 Not Implemented
KU0385 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,028 $4,050 Implemented
KU0385 # 02 Y:1992 02 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,119 $1,080 Implemented
KU0385 # 03 Y:1992 03 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $440 $30 Implemented
KU0385 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,367 $5,928 Not Implemented
KU0385 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $853 $0 Not Implemented
KU0385 # 06 Y:1992 06 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,786 $2,365 Implemented
AM0144 # 01 Y:1992 01 1992 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $30,000 $0 Not Implemented
AM0144 # 02 Y:1992 02 1992 REDUCE FLUID FLOW RATES $7,610 $750 Not Implemented
AM0144 # 03 Y:1992 03 1992 OPTIMIZE PLANT POWER FACTOR $3,370 $6,000 Not Implemented
AM0144 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,990 $0 Not Implemented
AM0144 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $423 $960 Not Implemented
AM0144 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $350 $0 Not Implemented
AM0144 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $340 $300 Not Implemented
AM0144 # 08 Y:1992 08 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $260 $510 Not Implemented
AM0130 # 01 Y:1991 01 1991 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,280 $19,700 Not Implemented
AM0130 # 02 Y:1991 02 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,148 $653 Not Implemented
AM0130 # 03 Y:1991 03 1991 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $4,979 $16,000 Not Implemented
AM0130 # 04 Y:1991 04 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,370 $0 Not Implemented