Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

443

matching recommendations
Reset
SIC 2434 Wood Kitchen Cabinets
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0683 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,404 $1,350 Not Implemented
TN0683 # 05 Y:2000 05 2000 ELIMINATE/REDUCE AN OPERATION $6,000 $17,000 Not Implemented
TN0683 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $3,365 $192 Not Implemented
TN0683 # 07 Y:2000 07 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $2,735 $1,580 Not Implemented
TN0683 # 08 Y:2000 08 2000 INSTALL SET-BACK TIMERS $1,425 $2,110 Implemented
TN0683 # 09 Y:2000 09 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $506 $0 Implemented
TN0683 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $197 $352 Implemented
AM0369 # 01 Y:2000 01 2000 RECOVER AND REUSE WASTE MATERIAL $60,700 $0 Not Implemented
AM0369 # 02 Y:2000 02 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $51,000 $780 Not Implemented
AM0369 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,000 $2,240 Implemented
AM0369 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,370 $2,000 Implemented
AM0369 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,280 $500 Implemented
AM0369 # 06 Y:2000 06 2000 OPTIMIZE PLANT POWER FACTOR $2,620 $8,100 Implemented
AM0369 # 07 Y:2000 07 2000 PAY BILLS ON TIME TO AVOID LATE FEES $581 $0 Implemented
AM0369 # 08 Y:2000 08 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $170 $140 Implemented
AS0266 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,785 $7,353 n/a
AS0266 # 02 Y:2000 02 2000 INSTALL OCCUPANCY SENSORS $574 $1,050 n/a
AS0266 # 03 Y:2000 03 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $304 $377 n/a
AS0266 # 04 Y:2000 04 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $122 $100 n/a
AS0266 # 05 Y:2000 05 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $1,039 $60 n/a
AS0266 # 06 Y:2000 06 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,615 $7,674 n/a
AS0266 # 07 Y:2000 07 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $472 $120 n/a
AS0266 # 08 Y:2000 08 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $172,500 $26,000 n/a
AS0266 # 09 Y:2000 09 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,626 $240 n/a
CO0447 # 01 Y:1999 01 1999 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,160 $5,000 Implemented