IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 249 Miscellaneous Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0417 # 04 Y:2016 04 2016 USE PHOTOCELL CONTROLS $142 $45 Not Implemented
SU0417 # 03 Y:2016 03 2016 REDUCE SCRAP PRODUCTION $79,948 $15,445 Not Implemented
SU0417 # 02 Y:2016 02 2016 DISCONNECT BALLASTS $321 $0 Not Implemented
SU0417 # 01 Y:2016 01 2016 PAY BILLS ON TIME TO AVOID LATE FEES $50 $0 Not Implemented
SU0417 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $553 $229 Not Implemented
SU0417 # 07 Y:2016 07 2016 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $51 $53 Not Implemented
SU0417 # 09 Y:2016 09 2016 REDUCE VENTILATION AIR $374 $875 Not Implemented
SU0417 # 08 Y:2016 08 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $717 $872 Not Implemented
SU0417 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $991 $384 Not Implemented
SU0417 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,629 $71,075 Not Implemented
SU0417 # 10 Y:2016 10 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $396 $1,514 Not Implemented
SU0415 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $121 $157 Implemented
SU0415 # 04 Y:2016 04 2016 REPLACE BOILER $5,067 $23,111 Implemented
SU0415 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,422 $27,505 Implemented
SU0415 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $335 $0 Not Implemented
SU0139 # 01 Y:2002 01 2002 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $602,817 $2,180,000 Not Implemented
SU0139 # 02 Y:2002 02 2002 RECOVER AND REUSE WASTE MATERIAL $22,050 $8,000 Not Implemented
SU0139 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $10,623 $2,160 Implemented
SU0139 # 04 Y:2002 04 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $8,410 $0 Not Implemented
SU0139 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,261 $11,724 Not Implemented
SU0139 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,799 $0 Not Implemented
SU0139 # 07 Y:2002 07 2002 OPTIMIZE PLANT POWER FACTOR $5,266 $16,600 Not Implemented
SU0139 # 08 Y:2002 08 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,186 $138 Implemented
SU0139 # 09 Y:2002 09 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,611 $570 Not Implemented
HO0191 # 02 Y:1999 02 1999 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,826 $120 Implemented