IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,482

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0222 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,520 $3,000 Implemented
TN0222 # 06 Y:1984 06 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $953 $270 Implemented
LT0006 # 01 Y:1984 01 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $610 $300 Implemented
LT0006 # 02 Y:1984 02 1984 BURN WOOD BY-PRODUCTS FOR HEAT $38,459 $225,000 Implemented
LT0006 # 03 Y:1984 03 1984 COVER OPEN TANKS $1,646 $506 Not Implemented
LT0006 # 04 Y:1984 04 1984 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $640 $105 Implemented
LT0006 # 05 Y:1984 05 1984 INSULATE BARE EQUIPMENT $740 $1,600 Not Implemented
ST0001 # 01 Y:1984 01 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $31 $0 Implemented
ST0001 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $692 $537 Implemented
ST0001 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,350 $88 Implemented
ST0001 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,166 $0 Not Implemented
ST0001 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,130 $3,299 Implemented
ST0001 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $300 $65 Not Implemented
ST0001 # 07 Y:1984 07 1984 AIR CONDITION ONLY SPACE NECESSARY $846 $675 Implemented
ST0001 # 08 Y:1984 08 1984 INSTALL AUTOMATIC STACK DAMPER $923 $658 Not Implemented
ST0001 # 09 Y:1984 09 1984 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,902 $0 Implemented
ST0001 # 10 Y:1984 10 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,345 $0 Not Implemented
ST0001 # 11 Y:1984 11 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $934 $0 Not Implemented
UD0118 # 01 Y:1984 01 1984 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,495 $0 Implemented
UD0118 # 02 Y:1984 02 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,336 $335 Implemented
UD0118 # 03 Y:1984 03 1984 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $3,044 $0 Not Implemented
UD0118 # 04 Y:1984 04 1984 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,598 $126,000 Not Implemented
UD0115 # 01 Y:1984 01 1984 INSTALL STORM WINDOWS AND DOORS $30,317 $42,568 Implemented
UD0115 # 02 Y:1984 02 1984 USE OPTIMUM TEMPERATURE $662 $1,000 Implemented
UD0115 # 03 Y:1984 03 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,093 $239 Implemented