IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0073 # 07 Y:1989 07 1989 RECOVER WASTE HEAT FROM EQUIPMENT $3,530 $44,000 Not Implemented
RU0073 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $278 $0 Implemented
RU0073 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,635 $645 Implemented
RU0073 # 04 Y:1989 04 1989 AIR CONDITION ONLY SPACE NECESSARY $846 $0 Not Implemented
RU0073 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,227 $2,028 Implemented
RU0073 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,131 $325 Implemented
RU0073 # 01 Y:1989 01 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,457 $450 Not Implemented
RU0057 # 02 Y:1989 02 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,269 $0 Not Implemented
RU0057 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,747 $1,539 Not Implemented
RU0057 # 03 Y:1989 03 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $594 Not Implemented
RU0057 # 04 Y:1989 04 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $387 $2,250 Not Implemented
RU0057 # 05 Y:1989 05 1989 IMPROVE LUBRICATION PRACTICES $379 $800 Not Implemented
RU0057 # 06 Y:1989 06 1989 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $807 $0 Not Implemented
RU0057 # 07 Y:1989 07 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,372 $0 Not Implemented
ST0001 # 10 Y:1984 10 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $4,345 $0 Not Implemented
ST0001 # 01 Y:1984 01 1984 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $31 $0 Implemented
ST0001 # 11 Y:1984 11 1984 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $934 $0 Not Implemented
ST0001 # 02 Y:1984 02 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $692 $537 Implemented
ST0001 # 09 Y:1984 09 1984 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,902 $0 Implemented
ST0001 # 08 Y:1984 08 1984 INSTALL AUTOMATIC STACK DAMPER $923 $658 Not Implemented
ST0001 # 07 Y:1984 07 1984 AIR CONDITION ONLY SPACE NECESSARY $846 $675 Implemented
ST0001 # 06 Y:1984 06 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $300 $65 Not Implemented
ST0001 # 05 Y:1984 05 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,130 $3,299 Implemented
ST0001 # 04 Y:1984 04 1984 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,166 $0 Not Implemented
ST0001 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,350 $88 Implemented