IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
SIC 25 Furniture And Fixtures
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0374 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,769 $140 Implemented
SD0374 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,927 $7,500 Implemented
SD0374 # 01 Y:2005 01 2005 INSTALL AN UNINTERUPTABLE POWER SUPPLY $27,800 $0 Not Implemented
SD0374 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,046 $52,243 Implemented
SD0374 # 06 Y:2005 06 2005 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $688 $350 Implemented
SD0374 # 05 Y:2005 05 2005 COVER OPEN TANKS $2,000 $4,500 Not Implemented
SD0374 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,982 $220 Implemented
NC0326 # 01 Y:2005 01 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $18,944 $2,000 Not Implemented
NC0326 # 08 Y:2005 08 2005 IMPROVE SPACE COMFORT CONDITIONING $800 $350 Implemented
NC0326 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,112 $50 Implemented
NC0326 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $503 Implemented
NC0326 # 03 Y:2005 03 2005 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $6,834 $10,100 Not Implemented
NC0326 # 05 Y:2005 05 2005 INSTALL TIMERS AND/OR THERMOSTATS $3,139 $900 Implemented
NC0326 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $6,606 $5,000 Implemented
NC0326 # 04 Y:2005 04 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,368 $0 Implemented
NC0327 # 06 Y:2005 06 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,266 $2,312 Not Implemented
NC0327 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $71 $38 Implemented
NC0327 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $410 $820 Implemented
NC0327 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,743 $100 Implemented
NC0327 # 04 Y:2005 04 2005 DEVELOP A REPAIR/REPLACE POLICY $56 $83 Implemented
NC0327 # 02 Y:2005 02 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $595 $200 Implemented
NC0327 # 10 Y:2005 10 2005 AIR CONDITION ONLY SPACE NECESSARY $651 $1,251 Implemented
NC0327 # 07 Y:2005 07 2005 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $2,000 $1,000 Implemented
NC0327 # 09 Y:2005 09 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $331 $300 Not Implemented
NC0327 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $661 $0 Implemented