Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
169
matching recommendationsSIC | 2514 | Metal Household Furniture |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0021 # 05 Y:1992 | 05 | 1992 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,095 | $200 | Not Implemented |
HO0021 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $200 | Not Implemented |
HO0021 # 07 Y:1992 | 07 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $190 | $189 | Not Implemented |
HO0021 # 08 Y:1992 | 08 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $294 | $472 | Not Implemented |
HO0021 # 09 Y:1992 | 09 | 1992 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,511 | $600 | Not Implemented |
OK0251 # 01 Y:1988 | 01 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $408 | $249 | Not Implemented |
OK0251 # 02 Y:1988 | 02 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,185 | $3,399 | Implemented |
OK0251 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $146 | $351 | Not Implemented |
OK0251 # 04 Y:1988 | 04 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,977 | $600 | Not Implemented |
OK0251 # 05 Y:1988 | 05 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $743 | $0 | Implemented |
OK0251 # 06 Y:1988 | 06 | 1988 | USE RADIANT HEATER FOR SPOT HEATING | $3,249 | $3,150 | Implemented |
OK0251 # 07 Y:1988 | 07 | 1988 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $95 | $287 | Implemented |
UD0118 # 01 Y:1984 | 01 | 1984 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,495 | $0 | Implemented |
UD0118 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,336 | $335 | Implemented |
UD0118 # 03 Y:1984 | 03 | 1984 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $3,044 | $0 | Not Implemented |
UD0118 # 04 Y:1984 | 04 | 1984 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,598 | $126,000 | Not Implemented |
UD0066 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,419 | $2,525 | Implemented |
UD0066 # 02 Y:1982 | 02 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $147 | $0 | Implemented |
UD0066 # 03 Y:1982 | 03 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $769 | $0 | Implemented |