IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
SIC 26 Paper And Allied Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0068 # 01 Y:1989 01 1989 AIR CONDITION ONLY SPACE NECESSARY $5,037 $3,133 Not Implemented
RU0068 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,132 $0 Not Implemented
RU0068 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $548 $500 Implemented
RU0068 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,169 $1,912 Not Implemented
RU0030 # 01 Y:1988 01 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $706 $0 Not Implemented
RU0030 # 02 Y:1988 02 1988 IMPROVE LUBRICATION PRACTICES $1,333 $1,200 Implemented
RU0030 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $2,980 $167 Not Implemented
RU0030 # 04 Y:1988 04 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $20,724 $17,000 Not Implemented
RU0014 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $925 $200 Implemented
RU0014 # 02 Y:1987 02 1987 IMPROVE LUBRICATION PRACTICES $266 $0 Not Implemented
RU0014 # 03 Y:1987 03 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $389 $500 Not Implemented
RU0014 # 04 Y:1987 04 1987 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,240 $7,010 Implemented
RU0014 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $1,304 $600 Implemented
ST0057 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,477 $90 Implemented
ST0057 # 02 Y:1986 02 1986 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $175 $0 Implemented
ST0057 # 03 Y:1986 03 1986 RECOVER WASTE HEAT FROM EQUIPMENT $11,835 $6,500 Not Implemented
ST0057 # 04 Y:1986 04 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,016 $1,157 Implemented
ST0057 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,821 $381 Not Implemented
ST0057 # 06 Y:1986 06 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,144 $0 Implemented
ST0057 # 07 Y:1986 07 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,265 $5,000 Not Implemented
ST0057 # 08 Y:1986 08 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $9,004 $0 Implemented
ST0057 # 09 Y:1986 09 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,865 $0 Not Implemented
ST0057 # 10 Y:1986 10 1986 INSTALL AUTOMATIC STACK DAMPER $2,306 $3,000 Not Implemented
ST0054 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,436 $100 Implemented
ST0054 # 02 Y:1986 02 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,374 $0 Implemented