IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
SIC 262 Paper Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0018 # 02 Y:2013 02 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $109,212 $0 Implemented
IP0018 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,467 $430 Not Implemented
IP0018 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $734 $100 Not Implemented
IP0018 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,545 $1,400 Implemented
IP0018 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $5,669 $2,019 Not Implemented
IP0018 # 07 Y:2013 07 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $99,761 $59,384 Implemented
IP0018 # 01 Y:2013 01 2013 APPLY FOR INVESTMENT INCENTIVES $42,227 $0 Not Implemented
ND0314 # 04 Y:1998 04 1998 UPGRADE OBSOLETE EQUIPMENT $207 $930 n/a
ND0314 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $924 $750 n/a
ND0314 # 02 Y:1998 02 1998 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,180 $20,614 n/a
ND0314 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,728 $10,560 n/a
ND0314 # 05 Y:1998 05 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,863 $3,690 n/a
ND0314 # 06 Y:1998 06 1998 $3,629 $97,088 n/a
ND0314 # 07 Y:1998 07 1998 COMBINE UTILITY METERS $2,283 $1,250 n/a
ND0314 # 08 Y:1998 08 1998 OPTIMIZE PLANT POWER FACTOR $9,653 $11,700 n/a
ND0235 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $529 Implemented
ND0235 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $55,146 $30,640 Implemented
ND0235 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $135 $0 Not Implemented
ND0235 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $28,611 $49,230 Not Implemented
ND0235 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,805 $600 Not Implemented
ND0235 # 06 Y:1995 06 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $399,646 $125,000 Implemented
ND0235 # 07 Y:1995 07 1995 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $15,000 $30,000 Implemented
ND0235 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN WATER LINES AND VALVES $4,059 $1,500 Not Implemented
ND0235 # 09 Y:1995 09 1995 ELIMINATE LEAKS IN WATER LINES AND VALVES $11,544 $5,800 Not Implemented
ND0165 # 05 Y:1993 05 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $102 $320 Not Implemented