IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

72

matching recommendations
Reset
SIC 265 Paperboard Containers And Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0019 # 02 Y:2013 02 2013 APPLY FOR INVESTMENT INCENTIVES $166 $0 Not Implemented
IP0019 # 03 Y:2013 03 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $0 Implemented
IP0019 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,885 $164 Implemented
IP0019 # 05 Y:2013 05 2013 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $668 $715 Not Implemented
IP0019 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,889 $3,258 Implemented
IP0019 # 07 Y:2013 07 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $640 $957 Not Implemented
IP0019 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,290 $0 Not Implemented
SU0354 # 08 Y:2013 08 2013 DISCONNECT BALLASTS $555 $1,600 Not Implemented
SU0354 # 03 Y:2013 03 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,037 $876 Implemented
SU0354 # 02 Y:2013 02 2013 ELIMINATE/REDUCE AN OPERATION $9,433 $3,600 Not Implemented
SU0354 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $1,088 $1,424 Not Implemented
SU0354 # 04 Y:2013 04 2013 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $94,164 $91,400 Implemented
SU0354 # 06 Y:2013 06 2013 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $171 $438 Not Implemented
SU0354 # 01 Y:2013 01 2013 DISCONNECT BALLASTS $1,059 $320 Not Implemented
SU0354 # 07 Y:2013 07 2013 RECOVER WASTE HEAT FROM EQUIPMENT $20,936 $61,400 Implemented
SU0352 # 07 Y:2013 07 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $281 $240 Not Implemented
SU0352 # 06 Y:2013 06 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,473 $1,292 Implemented
SU0352 # 08 Y:2013 08 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $384 $504 Not Implemented
SU0352 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $743 $498 Implemented
SU0352 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $628 $290 Implemented
SU0352 # 02 Y:2013 02 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $263 $0 Not Implemented
SU0352 # 03 Y:2013 03 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,638 $267 Not Implemented
SU0352 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $837 $0 Not Implemented
SU0352 # 09 Y:2013 09 2013 ELIMINATE/REDUCE AN OPERATION $1,693 $3,338 Not Implemented
SU0352 # 10 Y:2013 10 2013 OPTIMIZE PLANT POWER FACTOR $5,157 $14,874 Not Implemented