IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

166

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0336 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,242 $16,000 Implemented
LE0336 # 09 Y:2012 09 2012 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $2,523 $2,500 Not Implemented
LE0336 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,616 $650 Implemented
LE0336 # 06 Y:2012 06 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,840 $3,000 Implemented
LE0336 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,762 $25 Implemented
LE0336 # 10 Y:2012 10 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $576 $840 Not Implemented
LE0336 # 01 Y:2012 01 2012 INSTALL TIMERS AND/OR THERMOSTATS $18,760 $150 Implemented
LE0336 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,173 $1,000 Implemented
LE0336 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,734 $8,000 Implemented
LE0336 # 05 Y:2012 05 2012 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $6,810 $368 Not Implemented
LE0303 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,351 $800 Implemented
LE0303 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,931 $25,900 Not Implemented
LE0303 # 02 Y:2010 02 2010 INSTALL TIMERS AND/OR THERMOSTATS $10,520 $650 Implemented
LE0303 # 08 Y:2010 08 2010 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,378 $3,000 Not Implemented
LE0303 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,909 $1,500 Not Implemented
LE0303 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $973 $1,000 Implemented
LE0303 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,131 $15 Implemented
LE0303 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,348 $1,672 Implemented
LE0303 # 05 Y:2010 05 2010 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,574 $7,000 Not Implemented
LE0303 # 04 Y:2010 04 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,385 $2,200 Not Implemented
LE0303 # 07 Y:2010 07 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,824 $3,000 Not Implemented
LE0270 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $38,971 $20,000 Not Implemented
LE0270 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,558 $11,908 Implemented
LE0270 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $20,241 $22,000 Not Implemented
LE0270 # 06 Y:2008 06 2008 REPAIR OR REPLACE STEAM TRAPS $10,498 $3,200 Implemented