IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,547

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0100 # 05 Y:1994 05 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,490 $175 Implemented
IA0100 # 06 Y:1994 06 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,837 $100 Not Implemented
IA0100 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,274 $1,680 Implemented
IA0100 # 08 Y:1994 08 1994 RECOVER WASTE HEAT FROM EQUIPMENT $9,056 $12,220 Implemented
IA0100 # 09 Y:1994 09 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,880 $5,000 Implemented
IA0100 # 10 Y:1994 10 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $761 $475 Implemented
IA0100 # 11 Y:1994 11 1994 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,016 $250 Not Implemented
ME0145 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,797 $300 Implemented
ME0145 # 02 Y:1994 02 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,471 $800 Not Implemented
ME0145 # 03 Y:1994 03 1994 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $827 $85 Not Implemented
ME0145 # 04 Y:1994 04 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $550 Not Implemented
OD0014 # 01 Y:1994 01 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $760 $1,242 Implemented
OD0014 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,974 $4,176 Not Implemented
OD0014 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,646 $800 Implemented
OD0014 # 04 Y:1994 04 1994 CONVERT COMBUSTION EQUIPMENT TO BURN OIL $28,185 $14,000 Not Implemented
OD0014 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $3,144 $3,183 Not Implemented
OD0014 # 06 Y:1994 06 1994 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $5,709 $975 Implemented
OD0014 # 07 Y:1994 07 1994 METER WASTE WATER $1,403 $200 Not Implemented
UM0010 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,874 $3,610 Implemented
UM0010 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,499 $13,386 Implemented
UM0010 # 03 Y:1994 03 1994 INSTALL OCCUPANCY SENSORS $824 $570 Not Implemented
UM0010 # 04 Y:1994 04 1994 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $163 $66 Not Implemented
UM0010 # 05 Y:1994 05 1994 INSTALL / REPAIR INSULATION ON STEAM LINES $125 $35 Implemented
IA0090 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $19,385 $17,738 Implemented
IA0090 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,489 $500 Implemented