IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,547

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0098 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,134 $302 Not Implemented
RU0098 # 04 Y:1990 04 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,244 $0 Implemented
RU0098 # 05 Y:1990 05 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,377 $1,250 Not Implemented
RU0098 # 06 Y:1990 06 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,352 $500 Not Implemented
RU0098 # 07 Y:1990 07 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,437 $6,800 Not Implemented
RU0098 # 08 Y:1990 08 1990 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $7,333 $13,400 Not Implemented
RU0098 # 09 Y:1990 09 1990 REPAIR AND ELIMINATE STEAM LEAKS $11,639 $1,455 Implemented
UD0321 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,217 $37,000 Implemented
UD0321 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,310 $7,500 Implemented
UD0321 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,760 $1,100 Implemented
UD0321 # 04 Y:1990 04 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,068 $14,000 Not Implemented
WI0086 # 01 Y:1990 01 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $39,882 $0 Not Implemented
WI0086 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,034 $2,719 Not Implemented
WI0086 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,311 $0 Not Implemented
WI0086 # 04 Y:1990 04 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,293 $7,000 Not Implemented
WI0086 # 05 Y:1990 05 1990 INSTALL STORM WINDOWS AND DOORS $1,028 $2,448 Not Implemented
WI0086 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $799 $250 Not Implemented
WI0086 # 07 Y:1990 07 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $679 $500 Not Implemented
WI0086 # 08 Y:1990 08 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $2,000 Not Implemented
RU0072 # 01 Y:1989 01 1989 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $34,166 $0 Not Implemented
RU0072 # 02 Y:1989 02 1989 IMPROVE LUBRICATION PRACTICES $2,938 $800 Not Implemented
RU0072 # 03 Y:1989 03 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,681 $6,660 Not Implemented
RU0072 # 04 Y:1989 04 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,696 $416 Implemented
RU0072 # 05 Y:1989 05 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,337 $2,400 Implemented
RU0072 # 06 Y:1989 06 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,923 $400 Implemented