IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

26

matching recommendations
Reset
SIC 2653 Corrugated And Solid Fiber Boxes
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0159 # 03 Y:1982 03 1982 INSTALL SET-BACK TIMERS $1,257 $0 Not Implemented
TN0159 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,463 $100 Not Implemented
TN0159 # 01 Y:1982 01 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $3,652 $578 Not Implemented
KU0063 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,441 $5,865 Not Implemented
KU0063 # 02 Y:1982 02 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,532 $230,000 Implemented
KU0063 # 03 Y:1982 03 1982 OPTIMIZE PLANT POWER FACTOR $2,215 $4,000 Not Implemented
KU0063 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $670 $0 Not Implemented
KU0063 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $173 $82 Implemented
KU0063 # 06 Y:1982 06 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,276 $450 Not Implemented
KU0063 # 07 Y:1982 07 1982 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $17,053 $57,400 Not Implemented
TN0138 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $800 Not Implemented
TN0138 # 02 Y:1982 02 1982 RECOVER WASTE HEAT FROM EQUIPMENT $2,000 $1,500 Not Implemented
TN0138 # 01 Y:1982 01 1982 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $500 $1,000 Not Implemented
GT0123 # 03 Y:1982 03 1982 REPAIR AND ELIMINATE STEAM LEAKS $4,378 $600 Implemented
GT0123 # 06 Y:1982 06 1982 BURN WASTE PAPER FOR HEAT $10,121 $46,000 Not Implemented
GT0123 # 05 Y:1982 05 1982 INSTALL TIMERS AND/OR THERMOSTATS $1,259 $2,000 Not Implemented
GT0123 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,770 $250 Implemented
GT0123 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,452 $564 Not Implemented
TN0103 # 03 Y:1982 03 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,421 $0 Not Implemented
TN0103 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,089 $150 Not Implemented
TN0105 # 01 Y:1982 01 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $1,189 $450 Not Implemented
TN0105 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $824 $320 Not Implemented
TN0105 # 03 Y:1982 03 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,800 $0 Not Implemented
TN0105 # 04 Y:1982 04 1982 INSTALL STORM WINDOWS AND DOORS $213 $1,267 Not Implemented
TN0103 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,426 $446 Not Implemented