IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 2655 Fiber Cans, Drums & Similar Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NT0014 # 02 Y:2023 02 2023 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $6,006 $6,160 Implemented
NT0014 # 04 Y:2023 04 2023 OPTIMIZE PLANT POWER FACTOR $2,486 $1,441 Implemented
NT0014 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,512 $0 Implemented
NT0014 # 01 Y:2023 01 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,483 $1,258 Implemented
NT0014 # 03 Y:2023 03 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $955 $0 Implemented
OR0675 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $31,062 $1,969 Implemented
OR0675 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,809 $23,810 Implemented
OR0675 # 01 Y:2016 01 2016 INSTALL EQUIPMENT TO MOVE PRODUCT $79,123 $89,654 Implemented
OR0675 # 04 Y:2016 04 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,199 $7,215 Not Implemented
MZ0181 # 02 Y:2015 02 2015 ELIMINATE/REDUCE AN OPERATION $419 $0 Not Implemented
MZ0181 # 01 Y:2015 01 2015 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,643 $4,000 Not Implemented
MZ0181 # 04 Y:2015 04 2015 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,719 $0 Implemented
MZ0181 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,725 $8,000 Not Implemented
WM0042 # 04 Y:2014 04 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,034 $2,340 Not Implemented
WM0042 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $501 $0 Not Implemented
WM0042 # 05 Y:2014 05 2014 USE SYNTHETIC LUBRICANT $3,625 $2,066 Not Implemented
WM0042 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,162 $9,680 Implemented
WM0042 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $322 $340 Implemented
WM0042 # 02 Y:2014 02 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $734 $288 Not Implemented
WM0042 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,231 $300 Implemented
UW0027 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,168 $2,280 Implemented
UW0027 # 03 Y:2009 03 2009 INSULATE BARE EQUIPMENT $5,716 $871 Not Implemented
UW0027 # 02 Y:2009 02 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,650 $37,000 Not Implemented
UW0027 # 01 Y:2009 01 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,632 $10,324 Not Implemented
UW0027 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $144 $0 Implemented