IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
Reset
SIC 2655 Fiber Cans, Drums & Similar Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0349 # 09 Y:1988 09 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $314 $135 Implemented
TN0349 # 10 Y:1988 10 1988 INSULATE BARE EQUIPMENT $314 $121 Implemented
TN0349 # 11 Y:1988 11 1988 IMPROVE LUBRICATION PRACTICES $259 $240 Implemented
RU0014 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $925 $200 Implemented
RU0014 # 02 Y:1987 02 1987 IMPROVE LUBRICATION PRACTICES $266 $0 Not Implemented
RU0014 # 03 Y:1987 03 1987 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $389 $500 Not Implemented
RU0014 # 04 Y:1987 04 1987 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,240 $7,010 Implemented
RU0014 # 05 Y:1987 05 1987 INSULATE BARE EQUIPMENT $1,304 $600 Implemented
MA0074 # 01 Y:1986 01 1986 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $1,075 $1,200 Implemented
MA0074 # 02 Y:1986 02 1986 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $158 $100 Implemented
MA0074 # 03 Y:1986 03 1986 IMPROVE LUBRICATION PRACTICES $365 $60 Implemented
MA0074 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $122 $300 Implemented
MA0074 # 05 Y:1986 05 1986 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $351 $540 Not Implemented
KU0157 # 01 Y:1985 01 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $19,738 $2,752 Not Implemented
KU0157 # 02 Y:1985 02 1985 IMPROVE LUBRICATION PRACTICES $1,569 $290 Implemented
KU0157 # 03 Y:1985 03 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,260 $4,000 Implemented
KU0157 # 04 Y:1985 04 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,889 $1,550 Implemented
KU0157 # 05 Y:1985 05 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $759 $1,016 Implemented
KU0157 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,893 $1,500 Implemented
KU0157 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $899 $1,480 Implemented
KU0157 # 08 Y:1985 08 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $357 $0 Implemented
KU0157 # 09 Y:1985 09 1985 INSTALL AUTOMATIC STACK DAMPER $745 $1,100 Implemented
OK0130 # 01 Y:1984 01 1984 INSTALL TIMERS AND/OR THERMOSTATS $1,811 $640 Implemented
OK0130 # 02 Y:1984 02 1984 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,941 $5,508 Implemented
OK0130 # 03 Y:1984 03 1984 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,191 $180 Implemented