IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 2671 Paper Coated & Laminated, Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0131 # 06 Y:1995 06 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $167 $360 Not Implemented
IA0131 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,181 $25 Implemented
IA0131 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,757 $390 Implemented
IA0131 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,393 $9,302 Implemented
IA0131 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $21,688 $64,875 Implemented
IA0131 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $33,809 $11,700 Not Implemented
AR0059 # 02 Y:1995 02 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $13,187 $3,130 Implemented
AR0059 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,115 $554 Implemented
AR0059 # 08 Y:1995 08 1995 INSULATE BARE EQUIPMENT $7,225 $210 Not Implemented
AR0059 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $996 $300 Implemented
AR0059 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,288 $200 Implemented
AR0059 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $623 $0 Implemented
AR0059 # 04 Y:1995 04 1995 OPTIMIZE PLANT POWER FACTOR $2,940 $7,020 Not Implemented
AR0059 # 03 Y:1995 03 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,258 $3,820 Implemented
UD0463 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,335 $16,387 Not Implemented
UD0463 # 02 Y:1995 02 1995 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,512 $12,000 Not Implemented
UD0463 # 01 Y:1995 01 1995 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $493 $0 Not Implemented
OD0022 # 03 Y:1995 03 1995 MODERATE COOLING TOWER OUTLET TEMPERATURE $3,379 $0 Not Implemented
OD0022 # 07 Y:1995 07 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,807 $400 Implemented
OD0022 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,353 $3,562 Implemented
OD0022 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,120 $4,008 Implemented
OD0022 # 04 Y:1995 04 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,277 $4,655 Implemented
OD0022 # 02 Y:1995 02 1995 METER WASTE WATER $6,284 $1,521 Implemented
OD0022 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,327 $25,510 Implemented
WI0228 # 01 Y:1995 01 1995 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION $16,786 $30,000 Not Implemented