Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsSIC | 2673 | Bags: Plastics, Laminated, & Coated |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0538 # 09 Y:1994 | 09 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $228,100 | $770,000 | Not Implemented |
GT0538 # 08 Y:1994 | 08 | 1994 | AIR CONDITION ONLY SPACE NECESSARY | $22,300 | $1,890 | Not Implemented |
GT0538 # 07 Y:1994 | 07 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,370 | $4,860 | Implemented |
GT0538 # 06 Y:1994 | 06 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,570 | $18,880 | Implemented |
GT0538 # 05 Y:1994 | 05 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $90,740 | $160,000 | Not Implemented |
GT0538 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,870 | $3,250 | Not Implemented |
GT0538 # 03 Y:1994 | 03 | 1994 | USE SYNTHETIC LUBRICANT | $14,510 | $0 | Not Implemented |
GT0538 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,850 | $3,000 | Not Implemented |
GT0538 # 01 Y:1994 | 01 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,230 | $2,500 | Implemented |
AM0205 # 02 Y:1994 | 02 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,830 | $0 | Implemented |
AM0205 # 09 Y:1994 | 09 | 1994 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $433 | $0 | Implemented |
AM0205 # 08 Y:1994 | 08 | 1994 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $590 | $80 | Implemented |
AM0205 # 07 Y:1994 | 07 | 1994 | INSULATE BARE EQUIPMENT | $2,800 | $490 | Implemented |
AM0205 # 06 Y:1994 | 06 | 1994 | INSTALL SKYLIGHTS | $3,915 | $0 | Not Implemented |
AM0205 # 05 Y:1994 | 05 | 1994 | INSULATE BARE EQUIPMENT | $3,660 | $1,890 | Implemented |
AM0205 # 04 Y:1994 | 04 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,170 | $630 | Implemented |
AM0205 # 03 Y:1994 | 03 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,430 | $0 | Implemented |
AM0205 # 01 Y:1994 | 01 | 1994 | OPTIMIZE PLANT POWER FACTOR | $14,843 | $23,805 | Implemented |
MO0113 # 01 Y:1994 | 01 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $11,008 | $5,100 | Not Implemented |
MO0113 # 02 Y:1994 | 02 | 1994 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $405 | $30 | Not Implemented |
MO0113 # 03 Y:1994 | 03 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,698 | $10,623 | Not Implemented |
MO0113 # 04 Y:1994 | 04 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $723 | $60 | Not Implemented |
MO0113 # 05 Y:1994 | 05 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,931 | $150 | Not Implemented |
MO0113 # 06 Y:1994 | 06 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,170 | $836 | Implemented |
MO0113 # 07 Y:1994 | 07 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,509 | $11,269 | Not Implemented |