IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
SIC 2679 Converted Paper Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0091 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,180 $1,500 Not Implemented
DL0091 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,580 $2,500 Implemented
DL0091 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,770 $300 Implemented
DL0091 # 05 Y:2012 05 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,500 $16,000 Not Implemented
DL0091 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,830 $5,500 Not Implemented
DL0091 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $7,530 $100 Not Implemented
DL0091 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $890 $800 Not Implemented
DL0091 # 09 Y:2012 09 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,030 $300 Not Implemented
DL0091 # 10 Y:2012 10 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,810 $325 Not Implemented
DL0091 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,450 $39,400 Not Implemented
RU0095 # 08 Y:1990 08 1990 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,140 $4,878 Implemented
RU0095 # 07 Y:1990 07 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $865 $584 Not Implemented
RU0095 # 06 Y:1990 06 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,859 $0 Not Implemented
RU0095 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $454 $269 Not Implemented
RU0095 # 04 Y:1990 04 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,156 $375 Not Implemented
RU0095 # 03 Y:1990 03 1990 REPAIR AND ELIMINATE STEAM LEAKS $4,881 $0 Implemented
RU0095 # 02 Y:1990 02 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $2,404 $72 Not Implemented
RU0095 # 01 Y:1990 01 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,594 $2,500 Implemented
RU0068 # 04 Y:1989 04 1989 INSTALL TIMERS AND/OR THERMOSTATS $2,169 $1,912 Not Implemented
RU0068 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $548 $500 Implemented
RU0068 # 02 Y:1989 02 1989 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,132 $0 Not Implemented
RU0068 # 01 Y:1989 01 1989 AIR CONDITION ONLY SPACE NECESSARY $5,037 $3,133 Not Implemented