IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,640

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0483 # 16 Y:2014 16 2014 INSULATE BARE EQUIPMENT $183 $181 Not Implemented
SU0357 # 01 Y:2014 01 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $509 $0 Not Implemented
SU0357 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $1,140 $521 Not Implemented
SU0357 # 03 Y:2014 03 2014 DISCONNECT BALLASTS $96 $0 Implemented
SU0357 # 04 Y:2014 04 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,080 $749 Not Implemented
SU0357 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,211 $1,388 Implemented
SU0357 # 06 Y:2014 06 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $595 $532 Implemented
SU0357 # 07 Y:2014 07 2014 ELIMINATE/REDUCE AN OPERATION $1,151 $1,668 Not Implemented
DL0121 # 01 Y:2014 01 2014 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $31,300 $0 Not Implemented
DL0121 # 02 Y:2014 02 2014 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,700 $0 Not Implemented
DL0121 # 03 Y:2014 03 2014 AIR CONDITION ONLY SPACE NECESSARY $22,620 $750 Not Implemented
DL0121 # 04 Y:2014 04 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,400 $13,500 Not Implemented
DL0121 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,400 $28,000 Not Implemented
DL0121 # 06 Y:2014 06 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,750 $1,300 Not Implemented
DL0121 # 07 Y:2014 07 2014 RECOVER WASTE HEAT FROM EQUIPMENT $4,960 $1,400 Not Implemented
DL0121 # 08 Y:2014 08 2014 INSTALL OCCUPANCY SENSORS $3,460 $3,210 Not Implemented
DL0121 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,200 $18,600 Not Implemented
DL0121 # 10 Y:2014 10 2014 TURN OFF EQUIPMENT WHEN NOT IN USE $1,830 $0 Not Implemented
WV0479 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $47,093 $0 Not Implemented
WV0479 # 02 Y:2013 02 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $32,413 $1,000 Implemented
WV0479 # 03 Y:2013 03 2013 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $28,584 $36,500 Not Implemented
WV0479 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $15,736 $4,480 Implemented
WV0479 # 05 Y:2013 05 2013 DEVELOP A REPAIR/REPLACE POLICY $9,967 $1,388 Implemented
WV0479 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,444 $1,100 Implemented
WV0479 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $6,892 $1,275 Implemented