Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

498

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0303 # 12 Y:2016 12 2016 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $325 $173 Implemented
MI0303 # 13 Y:2016 13 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $190 $80 Implemented
MI0291 # 01 Y:2016 01 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $49,064 $180,000 Not Implemented
MI0291 # 13 Y:2016 13 2016 INSTALL OCCUPANCY SENSORS $889 $683 Implemented
MI0291 # 10 Y:2016 10 2016 PAY UTILITY BILLS ON TIME $1,589 $0 Implemented
MI0291 # 09 Y:2016 09 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,071 $120 Implemented
MI0291 # 08 Y:2016 08 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $2,195 $1,128 Not Implemented
MI0291 # 07 Y:2016 07 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,625 $3,600 Implemented
MI0291 # 06 Y:2016 06 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,876 $40 Implemented
MI0291 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,659 $40 Implemented
MI0291 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,153 $1,660 Implemented
MI0291 # 03 Y:2016 03 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $11,963 $23,683 Not Implemented
MI0291 # 02 Y:2016 02 2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $13,909 $22,520 Not Implemented
MI0291 # 11 Y:2016 11 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,180 $760 Implemented
MI0291 # 12 Y:2016 12 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,118 $4,691 Not Implemented
MI0289 # 15 Y:2015 15 2015 PAY UTILITY BILLS ON TIME $90 $80 Implemented
MI0289 # 14 Y:2015 14 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $222 $706 Implemented
MI0289 # 13 Y:2015 13 2015 INSULATE BARE EQUIPMENT $302 $160 Implemented
MI0289 # 12 Y:2015 12 2015 INSTALL OCCUPANCY SENSORS $471 $663 Implemented
MI0289 # 11 Y:2015 11 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $480 $40 Not Implemented
MI0289 # 10 Y:2015 10 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $608 $1,660 Implemented
MI0289 # 09 Y:2015 09 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $756 $639 Implemented
MI0289 # 01 Y:2015 01 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,332 $40 Not Implemented
MI0289 # 02 Y:2015 02 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,812 $11,680 Implemented
MI0289 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,148 $18,346 Not Implemented