IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
SIC 27 Printing And Publishing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0483 # 04 Y:2017 04 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,643 $3,700 n/a
UM0483 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,305 $5,000 n/a
UM0483 # 03 Y:2017 03 2017 INSTALL OCCUPANCY SENSORS $860 $1,650 n/a
UM0483 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,638 $2,500 n/a
UM0355 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,008 $8,286 Implemented
UM0355 # 01 Y:2009 01 2009 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $6,255 $18,000 Not Implemented
UM0355 # 05 Y:2009 05 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $912 $912 Implemented
UM0355 # 03 Y:2009 03 2009 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,372 $500 Not Implemented
UM0355 # 04 Y:2009 04 2009 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $2,314 $500 Implemented
UM0334 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,188 $1,520 Not Implemented
UM0334 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,003 $25,980 Not Implemented
UM0334 # 02 Y:2008 02 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,418 $4,000 Not Implemented
UM0334 # 05 Y:2008 05 2008 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,000 $700 Not Implemented
UM0334 # 03 Y:2008 03 2008 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,388 $1,200 Not Implemented
UM0334 # 07 Y:2008 07 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $427 $500 Not Implemented
UM0334 # 06 Y:2008 06 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $658 $1,110 Not Implemented
UM0208 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $150 Implemented
UM0208 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,036 $10,015 Implemented
UM0208 # 01 Y:2002 01 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,164 $650 Implemented
UM0208 # 03 Y:2002 03 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,158 $100 Implemented
ND0355 # 05 Y:2000 05 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,602 $15,700 Implemented
ND0355 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $300 Implemented
ND0355 # 03 Y:2000 03 2000 INSTALL OCCUPANCY SENSORS $99 $300 Not Implemented
ND0355 # 02 Y:2000 02 2000 DEVELOP A REPAIR/REPLACE POLICY $3,820 $8,809 Not Implemented
ND0355 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,537 $345 Implemented