IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0802 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $29,299 $2,830 Implemented
MA0802 # 01 Y:2019 01 2019 RECOVER WASTE HEAT FROM EQUIPMENT $109,879 $475,000 Not Implemented
MA0802 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,748 $13,000 Not Implemented
MA0802 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,964 $22,750 Implemented
MA0802 # 03 Y:2019 03 2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $14,618 $47,380 Not Implemented
MA0645 # 01 Y:2009 01 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $6,990 $0 Implemented
MA0645 # 03 Y:2009 03 2009 OPTIMIZE PLANT POWER FACTOR $531 $2,665 Not Implemented
MA0645 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,047 $0 Implemented
MA0605 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,754 $525 Implemented
MA0605 # 03 Y:2006 03 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,515 $0 Implemented
MA0605 # 02 Y:2006 02 2006 INSTALL TIMERS AND/OR THERMOSTATS $17,280 $975 Implemented
MA0605 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $46,780 $18,225 Not Implemented
MA0316 # 03 Y:1994 03 1994 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,905 $629 Not Implemented
MA0316 # 07 Y:1994 07 1994 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $475 $312 Implemented
MA0316 # 06 Y:1994 06 1994 OPTIMIZE PLANT POWER FACTOR $1,389 $2,700 Not Implemented
MA0316 # 05 Y:1994 05 1994 INSTALL OCCUPANCY SENSORS $1,426 $1,789 Not Implemented
MA0316 # 04 Y:1994 04 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,618 $685 Implemented
MA0316 # 02 Y:1994 02 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,576 $0 Implemented
MA0316 # 01 Y:1994 01 1994 RECOVER WASTE HEAT FROM EQUIPMENT $21,512 $16,194 Not Implemented
MA0309 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,995 $1,466 Not Implemented
MA0309 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,151 $3,600 Implemented
MA0309 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,152 $2,873 Not Implemented
MA0309 # 01 Y:1994 01 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $15,504 $26,407 Implemented
MA0271 # 03 Y:1993 03 1993 INSTALL SET-BACK TIMERS $482 $160 Implemented
MA0271 # 01 Y:1993 01 1993 RECOVER MECHANICAL ENERGY $6,103 $158 Not Implemented