IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,301

matching recommendations
Reset
SIC 275 Commercial Printing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0127 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,393 $8,118 Implemented
MO0127 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,433 $140 Implemented
MO0127 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,043 $822 Not Implemented
MO0127 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,313 $50 Not Implemented
MO0127 # 08 Y:1994 08 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $523 $75 Implemented
MO0127 # 09 Y:1994 09 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $223 $292 Not Implemented
UD0436 # 01 Y:1994 01 1994 OPTIMIZE PLANT POWER FACTOR $11,729 $21,000 Implemented
UD0436 # 02 Y:1994 02 1994 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $18,122 $0 Not Implemented
UD0436 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $4,381 $7,000 Implemented
UD0436 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,299 $15,139 Implemented
UD0436 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $533 $518 Not Implemented
MA0309 # 01 Y:1994 01 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $15,504 $26,407 Implemented
MA0309 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,152 $2,873 Not Implemented
MA0309 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,151 $3,600 Implemented
MA0309 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,995 $1,466 Not Implemented
UD0433 # 01 Y:1994 01 1994 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $6,342 $20,000 Not Implemented
UD0433 # 02 Y:1994 02 1994 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,410 $0 Implemented
UD0433 # 03 Y:1994 03 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,059 $300 Implemented
UD0433 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $1,093 $2,500 Not Implemented
UD0433 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,315 $1,950 Implemented
AS0120 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,087 $49,812 Not Implemented
AS0120 # 02 Y:1994 02 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,051 $320 Not Implemented
AS0120 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,591 $158 Not Implemented
AS0120 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $1,081 $975 Not Implemented
AS0120 # 05 Y:1994 05 1994 USE PHOTOCELL CONTROLS $785 $480 Not Implemented